Vacancy expired!
Eagle Creek Sartell Hydro has an immediate opening for a part time operator at our Hydro Electric plant located in Sartell, MN. The successful candidate will assist with the day to day operations of a 9.5 Mega Watt hydroelectric generating plant.
Duties include:
Assist with maintenance activities
Control river level
Monitor generators
Perform housekeeping
Other activities as needed
Expectations:
Work activities will be both indoors and out.
Expect to work 20 hours per week including every other weekend.
Comfortable climbing, crouching, and lifting up to 50 lbs
This position works well for a student as the work schedule can be flexible to accommodate student's class schedules. High School Diploma or GED (18 years or older) minimum requirement.
Apply on the Eagle Creek Renewable Energy website by copy/pasting the following address into your browser: https://www.eaglecreekre.com/contact-careers