Mechanical Assembly Of Component Parts

Mechanical Assembly Of Component Parts

30 Sep 2024
Florida, Gainesville, 32601 Gainesville USA

Mechanical Assembly Of Component Parts

Disassemble and assemble recreational electrical pedestal payment station at the "Waldo Motorsports RV Park". 1st step is to remove the front hinged door and remove 4 machine screws of the front electrical outlet plate. Next is to drill 3 holes in the top of the pedestal and attach the LED lamp with M4 machine screws and M4 KEP nuts. Next, remove the 3 circuit breakers and the attached 4 wires. Then mark with a pencil and drill 2 holes in the back of the metal pedestal. Then install the dual relay plate with 2 M4 machines screws and M4 KEP nuts. Next attach the 4 wires to the 2 relays for power input from the 4 circuit breakers. Then install the 4 wires on the other side of the 2 relays. Then attach the other ends of the 4 wires to the 50A, 30A and 20A outlets. There are a total of 70 of these pedestals to be completed. So far only 11 are completed.

Requires the skill of using power tools to drill 2 holes in the back panel and top of the metal pedestal. (see photos) Step by step training is provided. You must have a good mechanical capability to perform these above steps. This is an outside job that requires working under an umbrella. The English language is not required. All tools are furnished. Hours are 9:00am - 5:30pm with a 30 minute lunch break

Job Details

Jocancy Online Job Portal by jobSearchi.