The front entrance to building 930 needs ADA compliant hand rails installed in conjunction with the existing railing.

Findings: The exterior ramp to the main entry has two non-compliant handrails. One railing is loose and unstable. (NFPA 101, 2024, 39.2.2.3, 7.2.2.4.1.1 and 7.2.2.4.1.6).

Recommendation: Provide one, 1-1/2” steel pipe, ramp mounted, handrail with a 12 inch extension at the base of the ramp and continue to existing railing on east side of ramp, approximately 8 FT long. Mount the rail 34 in. to 38 in. above the ramp. Securely anchor to the concrete ramp with expansion anchors. Re-secure existing railing to existing concrete slab. Verify that the railing can withstand a lateral concentrated load of 200 LBS.

Please email reach out for full copy of Scope of Work

MANDATORY SITE WALK: October 7, 2025 10AM