Water Meter Field Survey Coordinator

Water Meter Field Survey Coordinator

14 Jun 2024
Oregon, Portland, 97201 Portland USA

Water Meter Field Survey Coordinator

Looking for 8-10 staff to provide field surveys condition survey for water meters. Below is a sample of scope of work for the field coordinator.

NTP: Mid July 2024

Duration: 4 months

Full-time work

Equipment: Company will provide

Mileage will be compensated

Background and Purpose

The Portland Water Bureau is preparing to replace or upgrade existing water meters as part of the City’s transition to advanced metering infrastructure (AMI). The scope of work at each meter location will depend on:

The age and manufacturer of the existing water meter

The meter box lid material

The meter box condition and location

The field conditions survey will include the following tasks: The lead will be responsible for managing the field staff and providing a quality control review of their reports. The team will be inspecting over 80,000 meters in the Portland Metropolitan area.

The Field Coordinator will collect the following data points at each location:

a. Unlocatable (yes/no skip logic)

b. Lid material (dropdown selection: cast iron only, concrete with cast iron flap, composite, other)

c. Box location (dropdown selection: grass/soil/gravel, sidewalk-concrete, driveway-concrete, roadway-pavement, other)

d. Tree within 5 feet? (yes/no)

e. Photo of area surrounding meter box

f. Photo of lid closeup

Related jobs

Job Details

Jocancy Online Job Portal by jobSearchi.