Scope of work: scope of work: 30 ton chiller one of the refrigeration loops total two has a failed compressor.
-evacuate system of refrigerant
-remove compressor and filter/drier
-install braze in new compressor and filter dryer
-pressure test with n2
-evacuate system
-charge with refrigerant
-test system we have gauges evac pump recovery pump and tank n2 and refrigerant we can provide oxy/acetylene torch if needed 35-40 DOE PER HR MUST HAVE 4- 5 YEARS OF EXPERIENCE